chinesechinese EnglishEnglish Site map|Collection of the station|About us|Contact us|Online messageWelcome to Zhitong Yuanfeng Technology Co. Wuxi, Ltd.'s official website.!

Professional R & D, design and sales, planetary mixer
Emulsifying machine, strong mixer, paint, adhesive production
And filling equipment, etc.

Consultation hotline0086-180-6828-1810

ztyf
Contact us
tel:0086-18068281810

Mobile phone:0086-18068281810

tel:0510-66035185

fax:0510-85950277

Email:sales@wxztyf.cn

add:No. 5-1, Dongqing Road, Hudai Ind. Zone, Binhu Dist., Wuxi, Jiangsu, China (Mainland)

Safe use of vacuum emulsifying machine

Article source:人气: date:2015-9-12 15:41:10
 In the field of chemical industry, the vacuum emulsification machine is widely used in the market. The vacuum emulsifying machine is stable and easy to operate. However, as a kind of large-scale application, it still needs to pay more attention to its operation.
First of all, on the power supply, power supply, and pay attention to the ground wire, open the total power switch, power indicator light. Not long after the electrical wiring or reactivated when operating the steering cylinder for emulsification test switch, from the top down to reverse. When the test should be the first point of the dynamic mixing test, confirmed that no mistake again for the operation of the homogeneous device. Properly connected to the pipe (including the overflow gate, water inlet and outlet, etc.).
Secondly, vacuum before work to check if a pot and lid stickers, pot, cover, etc. is Gaiyan, reliable sealing. Close the lid on the valve interface, and then open the lid on the vacuum valve, then open the vacuum pump vacuum, meet the requirements after the closure of the vacuum pump, and turn off the vacuum valve.
Large homogeneous cutting, scraper stirring: after feeding (debugging, available water instead) then open the corresponding control switch control operation of homogenizer in operation and scraper stirring. Before operating the emulsification start, check whether there are abnormal stirring and scraping the wall, as should be immediately excluded.
Finally, vacuum pump in homogeneous seal condition under the pot start. If there is a special need to open the air pump, the operation can not be over 3 minutes. The vacuum pump is forbidden without working fluid. Pump operation is prohibited to plug the exhaust port. Regular inspection of all parts and bearings within the lubricating oil and grease, timely replacement of clean lubricating oil and grease.
Keep clean homogenizer. Every time you want to stop using or replacement of materials should be cleaning contact part of the homogenizer and working fluid, especially at the head of the cutting wheel sets of cutting, homogeneous shaft sleeve of the sliding bearing and a shaft sleeve. Cleaning reassemble the FLAC rotating impeller should be no clamping stagnation, cooker body and the cooker cover two flanges relative fixed move homogenizer motor to correct, no other abnormalities, can start operation.
All pan clean work by the user according to the standard treatment.
Note:
1, an homogeneous cutting head as the rotational speed is very high, not running in the empty pot condition, in order to avoid local heating effect after sealing.
2, an earth connection, to ensure safe use of electricity.
O 3, homogenizer from look down to reverse, motor wiring or not a long time to reinstate all jog test, emulsifying cylinder to the look down to reverse, stirring leaf from the top down view for clockwise. When the test should be the first point of the dynamic mixing test, confirmed that no mistake again for the operation of the homogeneous device.
Sales 4, before the start of each mixing are operating, check whether the abnormal wall scraping stirring, as should be immediately excluded.
O 5, stirring pumping vacuum must check if a pot and lid stickers, pot, cover, etc. is Gaiyan, reliable sealing.
Sales 6, vacuum pump before the shutdown, should be put before the closing valve vacuum pump.
Sales 7, vacuum pump in homogeneous seal condition under the pot start. If there is a special need to open the air pump, the operation can not exceed 3 minutes.
Sales of 8, before performing any maintenance or cleaning equipment must be cut off access to power.
9, sales must be in the operation of the equipment in hand into the reactor, to prevent accidents.
10, the basic operation process such as a different response to immediately stop operation, to find out the reason behind the boot.